Opened 3 years ago
Last modified 2 years ago
#2909 closed enhancement
Update how the accession action date is displayed on the PW — at Version 1
| Reported by: | Lisa Burke | Owned by: | Kay Kittell |
|---|---|---|---|
| Priority: | medium | Milestone: | Server 2.3.8 |
| Component: | Public Website 2 | Version: | N/A |
| Severity: | Keywords: | ||
| Cc: | Database Engine: | N/A | |
| Operating System: | N/A |
Description (last modified by )
From Mark Millard:
May I propose something be done on the accession action date presentation. I entered both a start data and a finish date on an action I recently entered for PI 444489. The dates look screwy at the end. May I propose that only the last date of start and finish be displayed. If they are both there finished should be the one to appear.
See attachment
Change History (3)
by , 3 years ago
| Attachment: | Acc action date web visible.docx added |
|---|
comment:1 by , 3 years ago
| Description: | modified (diff) |
|---|---|
| Milestone: | → Server 2.3.8 |
| Status: | new → addressed |
Changed Controls/accessiondetail/accessionactions so that if there is a finished date, only it shows finished date, otherwise it shows start date. Also corrected minor bug that if the note has a . with a space, it doesn't add a second period.

Acc action date on PW